A consistent path from submission to decision

Every application moves through the same seven stages — with defined human approval points along the way.

Illustrative preview of the PermitAssure upload queue, showing document validation, classification and status for architectural drawings, a BIM model and supporting documents as they are submitted
1

Submit

Forms, drawings, BIM models, reports and supporting documents enter through a portal or API.

2

Understand

Documents are classified and relevant project, building, drawing and model data are extracted.

3

Validate

Completeness, consistency and information quality are checked before deeper review begins.

Human approval point: Coordinators confirm intake decisions and escalations.
4

Check

Configured rules, code knowledge and review policies are applied to the available evidence.

5

Review

Qualified professionals validate findings, apply judgment, and make or recommend decisions.

Human approval point: Reviewers confirm, modify or reject every finding before it is final.
6

Resolve

Applicants and reviewers collaborate on questions, missing information, comments and revisions.

Human approval point: Reviewers verify resolutions before closing a finding.
7

Report and Learn

Reports, audit trails and analytics support decisions and continuous improvement.

Human approval point: Authorized officials issue final decisions and reports.

An example permit journey

A construction inspector in a high-visibility vest recording notes on a tablet inside a wood-framed building

Illustrative example — fictional project. A design-build team submits drawings and a structural model for a mid-size mixed-use renovation.

  1. The portal confirms structural and mechanical drawings are missing a required schedule and flags it before the file enters the queue.
  2. Once resubmitted, the system extracts title-block data and classifies each sheet by discipline.
  3. Configured rules check egress, fire separation and accessibility requirements against the submitted drawings.
  4. A plans examiner reviews three potential issues, confirms one as a genuine deficiency, and dismisses another as not applicable.
  5. The applicant's engineer responds to the confirmed comment with a revised drawing; the revision is compared automatically against the prior version.
  6. The examiner verifies the resolution and closes the finding — the platform records the decision, evidence and reviewer in the audit trail.